About Bristar Non-Explosive Demolition Agent

Time Required for Crack Formation

The time required for crack formation in material at 20ÉC (68ÉF) is about 10-20 hours. The lower the temperature the longer crack formation takes. The crack width for rock continues to increase with time and can become 10-30 mm (3/8" - 1 1/8 ") after several days, depending on free surfaces available. It is best to wait until the BRISTAR has worked to full depth before removing rock as premature removal at the first sign of a crack can hamper the leverage effect of BRISTAR.

 

 

 

Demolition Technologies BRISTAR Distributors
P.O. Box 427
107 Mildred Street
Greenville, AL 36037
Phone: 1-800-282-4384
Fax: (334) 382-7548 
Email: info@demolitiontechnologies.com



 
About Bristar Non-Explosive Demolition Agent
Bristar Technical information
Properties Of BRISTAR
Fracture Mechanism
Test Breaking and Drilling
Mixing and Filling BRISTAR
Crack Formation Time
Container and Storage
BRISTAR Caution
Demolition Design for Rock
Demolition Design for Concrete
MSDS Sheet
BRISTAR Order Requests